Production insights
Actual vs estimated time, operator feedback and the audit trail.

- Performance — operations ranked by variance between actual and estimated time over the last 90 days.
- Estimate accuracy — how close estimates are to what actually happens.
- Feedback — operator feedback by category, with what's open and resolved.
- Audit trail — every step start, pause, resume and completion with who and when.
Improvement signals at the top point to the next thing worth fixing, such as feedback waiting for review.